Title of article
Project of the GT-MHR high-temperature helium reactor with gas turbine Original Research Article
Author/Authors
A.I. Kiryushin، نويسنده , , N.G. Kodochigov، نويسنده , , N.G. Kouzavkov، نويسنده , , N.N. Ponomarev-Stepnoi، نويسنده , , E.S. Gloushkov، نويسنده , , V.N. Grebennik، نويسنده ,
Issue Information
روزنامه با شماره پیاپی سال 1997
Pages
11
From page
119
To page
129
Abstract
In February 1995, MINATOM of Russia and General Atomics (USA) signed the Agreement for the development and design of the GT-MHR facility with a modular helium reactor and a gas turbine intended to be constructed in Russia. This Agreement was subsequently expanded by the participation of Framatom and Fuji Electric. The GT-MHR facility is designed for burning weapons-grade plutonium and utilization of the heat produced in the direct gas-turbine cycle with electricity production efficiency of about 50%. In future such facilities with uranium fuel will be proposed for use as commercial NPPs. A GT-MHR prototype and fuel production facility are intended to be constructed at the Siberian Chemical Combine in Seversk (Tomsk-7). In accordance with the Agreement, a conceptual design of the GT-MHR should be developed in September 1997. As a part of the conceptual design, a reactor module with a power conversion system is being designed and plutonium fuel is being developed.
Journal title
Nuclear Engineering and Design Eslah
Serial Year
1997
Journal title
Nuclear Engineering and Design Eslah
Record number
888296
Link To Document