Abstract :
The decision making environment of an operating nuclear power plant is presented. The organizations involved, their roles and interactions as well as the main influencing factors and decision criteria are described. The focus is on safety-related decisions, and the framework is based on the situation at Loviisa power station. The role of probabilistic safety assessment (PSA) is illustrated with decisions concerning plant modifications, optimization, acceptance of temporary configurations and extended repair times. Suggestions are made for rational and flexible risk-based control of allowed times to operate the plant with some components out of service.