Title of article :
Probabilistic safety analyses developments resurgence in Bulgaria—Kozloduy nuclear power plant example
Author/Authors :
Bozhana Marinova، نويسنده , , Pavlin Groudev، نويسنده , , Valentin Papazov، نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 2010
Pages :
6
From page :
880
To page :
885
Abstract :
This paper presents some of the main technical features and insights of the Kozloduy nuclear power plant (NPP) units 5 and 6 probabilistic safety analysis (PSA) level 1. Probabilistic analyses and their applications in Bulgaria were given further impetus in recent years. More than 17 years after the first PSA study in Bulgaria in 1992 today probabilistic analyses receive increasing attention and application than ever before. The Bulgarian regulatory body (BNRA) is also interested in expanding their capability of reviewing and using PSA in plant safety assessments. In November 2008 within the framework of the program financed by European Union (PHARE), a project for assisting the BNRA in establishing the regulatory requirements on the base of PSA was completed. One of the objectives of this project was performance of the independent review of Kozloduy NPP units 5 and 6 PSA. This review was a new impulse for the authors to present in more details of Kozloduy NPP probabilistic assessment studies in the present paper.
Journal title :
Nuclear Engineering and Design Eslah
Serial Year :
2010
Journal title :
Nuclear Engineering and Design Eslah
Record number :
895621
Link To Document :
بازگشت