• Title of article

    Identifying, Prioritization and Responding to Quality Risks Using COQ Approach in Construction Industry

  • Author/Authors

    غضنفري، وحيد نويسنده School of Industrial Engineering, Islamic Azad University, Tehran South Branch, Tehran, Iran Ghezavati, Vahidreza , شجاعي ، اميرعباس نويسنده , , اسفندياري ، حسين نويسنده ,

  • Issue Information
    روزنامه با شماره پیاپی 0 سال 2013
  • Pages
    12
  • From page
    21
  • To page
    32
  • Abstract
    In this study, we use a systematic method of linear programming model to select the best strategies for responding to project risk. At first, according to the past research 96 risks of a major series of project risks are identified and then 35 quality risks are identified due to the main goal of this research. These mentioned risks effect on work quality, in other words the conformity with customer expectation. After that the prioritization phase started. In this part, we prioritize risks by 3 different stages, first using quality criteria, second using FMEA (Failure Mode and Effects Analysis) techniques and third using COQ (Cost of Quality) techniques and finally critical risks are identified. Then prioritize risks according to decision making methods. In the response phase in order to select the best strategy for each risk a zero-one linear programming will be presented. For a real-world case study of this research a road construction project of a construction company is chosen.
  • Journal title
    Caspian Journal of Applied Sciences Research
  • Serial Year
    2013
  • Journal title
    Caspian Journal of Applied Sciences Research
  • Record number

    903321