Title of article :
Measurement of some typical parameters in the realization of a signal management plant in railway diagnostics
Author/Authors :
A.، Zanobini, نويسنده , , M.، Ghizzani, نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 2003
Abstract :
All transport of diagnostic information apparatus, necessary for safe and correct railway service, commits its running to the available medium: telephone cables. We have to manage with a multitude of protocols, each employed in its equipment. In this context, we have made some measures to verify that the line in the telephone cable from Florence Station to Rifredi Station, in Italy, was good. Then, we have tried to develop a plant and a telecommunication protocol, able to transfer data from a master and a certain number of slaves, with elements of versatility to adapt to different equipment. Obviously, this flexibility is limited by the characteristics of the considered channel.
Journal title :
IEEE TRANSACTIONS ON INSTRUMENTATION AND MEASUREMENT
Journal title :
IEEE TRANSACTIONS ON INSTRUMENTATION AND MEASUREMENT