• Title of article

    A semi-infinite programming model for earliness/tardiness production planning with a genetic algorithm

  • Author/Authors

    Dingwei Wang، نويسنده , , S. -C. Fang، نويسنده ,

  • Issue Information
    دوهفته نامه با شماره پیاپی سال 1996
  • Pages
    12
  • From page
    95
  • To page
    106
  • Abstract
    To closely describe the earliness/tardiness production planning problems in the JIT environment, a nonlinear semi-infinite programming model is proposed. Due to the issues of non-convexivity and having infinitely many constraints, instead of applying traditional optimization approaches, a specially designed genetic algorithm with mutation along the negative gradient direction is developed. The proposed algorithm is a combination of the steepest descent method with the stochastic sampling algorithm. Some numerical results are included to show its potential for industrial applications.
  • Keywords
    Production planning , Earliness/tardiness schedule , Semi-infinite programming , Genetic Algorithm
  • Journal title
    Computers and Mathematics with Applications
  • Serial Year
    1996
  • Journal title
    Computers and Mathematics with Applications
  • Record number

    917794