Title of article
A semi-infinite programming model for earliness/tardiness production planning with a genetic algorithm
Author/Authors
Dingwei Wang، نويسنده , , S. -C. Fang، نويسنده ,
Issue Information
دوهفته نامه با شماره پیاپی سال 1996
Pages
12
From page
95
To page
106
Abstract
To closely describe the earliness/tardiness production planning problems in the JIT environment, a nonlinear semi-infinite programming model is proposed. Due to the issues of non-convexivity and having infinitely many constraints, instead of applying traditional optimization approaches, a specially designed genetic algorithm with mutation along the negative gradient direction is developed. The proposed algorithm is a combination of the steepest descent method with the stochastic sampling algorithm. Some numerical results are included to show its potential for industrial applications.
Keywords
Production planning , Earliness/tardiness schedule , Semi-infinite programming , Genetic Algorithm
Journal title
Computers and Mathematics with Applications
Serial Year
1996
Journal title
Computers and Mathematics with Applications
Record number
917794
Link To Document