Title of article
Parallel Processing Applied to the Planning of Hydrothermal Systems
Author/Authors
Silva، Edson Luiz da نويسنده , , Finardi، Erlon Cristian نويسنده ,
Issue Information
روزنامه با شماره پیاپی سال 2003
Pages
-720
From page
721
To page
0
Abstract
The objective of the long-term operating planning problem is to determine the optimum strategy for the generation of electricity, aiming toward the minimization of total operating cost over the planning period. In a competitive electricity market, with the participation of a significant number of hydroplants, such as in Brazil, precision modeling for operating planning is required so that a better use of hydraulic resources can be obtained. Therefore, in this paper, we present a long-term operating planning model based on an individual power plant representation. In order to support the high computational burden, a suitable parallel processing algorithm is proposed.
Keywords
Patients
Journal title
IEEE TRANSACTIONS ON PARALLEL AND DISTRIBUTED SYSTEMS
Serial Year
2003
Journal title
IEEE TRANSACTIONS ON PARALLEL AND DISTRIBUTED SYSTEMS
Record number
92280
Link To Document