Integrating the lot-sizing and sequencing decisions for scheduling a capacitated flow line
Author/Authors
Riyaz Sikora، نويسنده , , Dilip Chhajed، نويسنده , , Michael J. Shaw، نويسنده ,
Issue Information
ماهنامه با شماره پیاپی سال 1996
Pages
21
From page
659
To page
679
Abstract
In this paper we consider a general problem of scheduling a single flow line consisting of multiple machines and producing a given set of jobs. The manufacturing environment is characterized by sequence dependent set-up times, limited intermediate buffer space, and capacity constraints. In addition, jobs are assigned with due dates that have to be met. The objectives of the scheduling are: (1) to meet the due dates without violating the capacity constraints, (2) to minimize the makespan, and (3) to minimize the inventory holding costs. While most of the approaches in the literature treat the problem of scheduling in flow lines as two independent sub-problems of lot-sizing and sequencing, our approach integrates the lot-sizing and sequencing heuristics. The integrated approach uses the Silver-Meal heuristic (modified to include lot-splitting) for lot-sizing and an improvement procedure applied to Palmerʹs heuristic for sequencing, which takes into account the actual sequence dependent set-up times and the limited intermedite buffer capacity. We evaluate the performance of the integrated approach and demonstrate its efficacy for scheduling a real world SMT manufacturing environment.
Journal title
Computers & Industrial Engineering
Serial Year
1996