Title of article
Earliness/tardiness production planning approaches with due-window for manufacturing systems
Author/Authors
Dingwei Wang، نويسنده , , Wei Wang، نويسنده ,
Issue Information
ماهنامه با شماره پیاپی سال 1998
Pages
12
From page
825
To page
836
Abstract
Although the earliness/tardiness production planning approaches for manufacturing systems with due-date have appeared in the literature, in practice, customers prefer a time duration rather than an exact due-date. This kind of due-date is called due-window. This paper focuses on the production planning problems to minimize the total earliness and tardiness penalties with a due-window subject to the manufacturing resource constraints. Two models, one for mass manufacture and another for one-of-a-kind product (OKP) manufacture, are discussed separately. By means of mathematical deduction, the model for mass manufacture is translated into a linear programming problem and solved by a simplex method. In the case of OKP manufacture, the problem is reduced to a linear 0–1 programming model, using the elaborate definition of variables. The computational results show that both algorithms achieve the optimal production planning and are applicable to practical manufacturing systems.
Keywords
earliness/tardiness production planning , Linear programming , due-window , 0–1 Programming
Journal title
Computers & Industrial Engineering
Serial Year
1998
Journal title
Computers & Industrial Engineering
Record number
924822
Link To Document