• Title of article

    Earliness/tardiness production planning approaches with due-window for manufacturing systems

  • Author/Authors

    Dingwei Wang، نويسنده , , Wei Wang، نويسنده ,

  • Issue Information
    ماهنامه با شماره پیاپی سال 1998
  • Pages
    12
  • From page
    825
  • To page
    836
  • Abstract
    Although the earliness/tardiness production planning approaches for manufacturing systems with due-date have appeared in the literature, in practice, customers prefer a time duration rather than an exact due-date. This kind of due-date is called due-window. This paper focuses on the production planning problems to minimize the total earliness and tardiness penalties with a due-window subject to the manufacturing resource constraints. Two models, one for mass manufacture and another for one-of-a-kind product (OKP) manufacture, are discussed separately. By means of mathematical deduction, the model for mass manufacture is translated into a linear programming problem and solved by a simplex method. In the case of OKP manufacture, the problem is reduced to a linear 0–1 programming model, using the elaborate definition of variables. The computational results show that both algorithms achieve the optimal production planning and are applicable to practical manufacturing systems.
  • Keywords
    earliness/tardiness production planning , Linear programming , due-window , 0–1 Programming
  • Journal title
    Computers & Industrial Engineering
  • Serial Year
    1998
  • Journal title
    Computers & Industrial Engineering
  • Record number

    924822