Title of article :
Multi-period cell loading and cell size determination
Author/Authors :
Gursel A. Suer، نويسنده , , Ivan Sanchez Bera، نويسنده ,
Issue Information :
ماهنامه با شماره پیاپی سال 1998
Pages :
4
From page :
85
To page :
88
Abstract :
This paper focuses on simultaneous solution of cell loading and cell size determination in labor intensive manufacturing cells. The study performed is a multi-period analysis where decisions are made for next several periods. The objective is to maximize the number of products that can be completed with the available capacity in all of the periods considered. A two-phase solution methodology is proposed. In the first phase, alternative cell sizes are generated for various manpower levels and optimal manpower allocation is performed. In the second phase, two mathematical models are proposed to perform cell loading and determine the cell size simultaneously.
Keywords :
Cell Loading , Labor-intensive Manufacturing Cells , Multi-Period Analysis , Cell Size
Journal title :
Computers & Industrial Engineering
Serial Year :
1998
Journal title :
Computers & Industrial Engineering
Record number :
925170
Link To Document :
بازگشت