Title of article
Integrated process planning and scheduling with minimizing total tardiness in multi-plants supply chain
Author/Authors
Chiung Moon، نويسنده , , Jongsoo Kim، نويسنده , , Sun Hur، نويسنده ,
Issue Information
ماهنامه با شماره پیاپی سال 2003
Pages
19
From page
331
To page
349
Abstract
In this paper, we propose an integrated process planning and scheduling (IPPS) model for the multi-plant supply chain (MSC), which behaves like a single company through strong coordination and cooperation toward mutual goals. The IPPS problem is one of the most important issues for supporting the global objectives, because the function takes part in the assignment of factory resources to production tasks. The problem is formulated as a mathematical model considering alternative machines and sequences, sequence-dependent setup, and distinct due dates. The objective of the model is to decide the schedules for minimizing total tardiness through analysis of the alternative machine selection and the operation sequences in MSC. In order to obtain good approximate solutions, genetic algorithm-based heuristic approach is developed. Numerical experiments are carried out to demonstrate the efficiency of the proposed approach.
Keywords
Integrated process planning and scheduling , Traveling salesman problem , Supply chain , Genetic Algorithm
Journal title
Computers & Industrial Engineering
Serial Year
2003
Journal title
Computers & Industrial Engineering
Record number
925376
Link To Document