Title of article
A note on two-stage hybrid flowshop scheduling with missing operations
Author/Authors
Chao-Tang Tseng، نويسنده , , Ching-Jong Liao، نويسنده , , Tai-Xiang Liao، نويسنده ,
Issue Information
ماهنامه با شماره پیاپی سال 2007
Pages
10
From page
695
To page
704
Abstract
The scheduling problem in a multi-stage hybrid flowshop has been the subject of considerable research. All the studies on this subject assume that each job has to be processed on all the stages, i.e., there are no missing operations for a job at any stage. However, missing operations usually exist in many real-life production systems, such as a system in a stainless steel factory investigated in this note. The studied production system in the factory is composed of two stages in series. The first stage contains only one machine while the second stage consists of two identical machines (namely a 1 × 2 hybrid flowshop). In the system, some jobs have to be processed on both stages, but others need only to be processed on the second stage. Accordingly, the addressed scheduling problem is a 1 × 2 hybrid flowshop with missing operations at the first stage. In this note, we develop a heuristic for the problem to generate a non-permutation schedule (NPS) from a given permutation schedule, with the objective of minimizing the makespan. Computational results demonstrate that the heuristic can efficiently generate better NPS solutions.
Keywords
Scheduling , Hybrid flowshop , Makespan , Missing operations
Journal title
Computers & Industrial Engineering
Serial Year
2007
Journal title
Computers & Industrial Engineering
Record number
925623
Link To Document