Title of article :
Multiple lot-sizing decisions with an interrupted geometric yield and variable production time
Author/Authors :
Hsi-Mei Hsu، نويسنده , , Tai-Sheng Su، نويسنده , , Muh-Cherng Wu، نويسنده , , Liang-Chuan Huang، نويسنده ,
Issue Information :
ماهنامه با شماره پیاپی سال 2009
Pages :
8
From page :
699
To page :
706
Abstract :
This study examines a multiple lot-sizing problem for a single-stage production system with an interrupted geometric distribution, which is distinguished in involving variable production lead-time. In a finite number of setups, this study determined the optimal lot-size for each period that minimizes total expected cost. The following cost items are considered in optimum lot-sizing decisions: setup cost, variable production cost, inventory holding cost, and shortage cost. A dynamic programming model is formulated in which the duration between current time and due date is a stage variable, and remaining demand and work-in-process status are state variables. This study then presents an algorithm for solving the dynamic programming problem. Additionally, this study examines how total expected costs of optimal lot-sizing decisions vary when parameters are changed. Numerical results show that the optimum lot-size as a function of demand is not always monotonic.
Keywords :
Interrupted geometric distribution , Dynamic programming , Production lead-time , Production/inventory system , Lot-sizing
Journal title :
Computers & Industrial Engineering
Serial Year :
2009
Journal title :
Computers & Industrial Engineering
Record number :
925732