Title of article :
Series production in a basic re-entrant shop to minimize makespan or total flow time
Author/Authors :
Feng Chu a، نويسنده , , *، نويسنده , , Chengbin Chu b، نويسنده , , Caroline Desprez a، نويسنده , , c، نويسنده ,
Issue Information :
ماهنامه با شماره پیاپی سال 2010
Pages :
12
From page :
257
To page :
268
Abstract :
This paper addresses a real life shop scheduling problem in a manufacturing company. In this problem, a set of n identical jobs are to be processed on two machines. Every job visits one of the machines more than once. This is therefore a re-entrant shop. Due to the fact that the jobs are identical, the decision version of this problem is even not in the class NP. We give an optimal schedule to minimize the makespan. Since the total flow time depends on the relations between the processing times, we decompose this problem into sub-problems according to the relations between the processing times. We prove various properties of optimal solutions and, based on these properties, we provide an optimal solution for all the sub-problems except one of them. For the sole remaining sub-problem, we prove a dominance property which allows to consider a part of schedules to find an optimal one.
Keywords :
Total flow time , Scheduling , Series production , Re-entrant shop , Makespan
Journal title :
Computers & Industrial Engineering
Serial Year :
2010
Journal title :
Computers & Industrial Engineering
Record number :
925844
Link To Document :
بازگشت