Title of article
Mathematical modeling for solving manufacturing run time problem with defective rate and random machine breakdown
Author/Authors
Yuan-Shyi Peter Chiu، نويسنده , , Hong-Dar Lin، نويسنده , , ?، نويسنده , , Huei-Hsin Chang b، نويسنده ,
Issue Information
ماهنامه با شماره پیاپی سال 2011
Pages
9
From page
576
To page
584
Abstract
This paper employs mathematical modeling for solving manufacturing run time problem with random
defective rate and stochastic machine breakdown. In real life manufacturing systems, generation of nonconforming
items and unexpected breakdown of production equipment are inevitable. For the purpose of
addressing these practical issues, this paper studies a system that may produce defective items randomly
and it is also subject to a random equipment failure. A no resumption inventory control policy is adopted
when breakdown occurs. Under such a policy, the interrupted lot is aborted and malfunction machine is
immediately under repair. A new lot will be started only when all on-hand inventory are depleted. Modeling
and numerical analyses are used to establish the solution procedure for such a problem. As a result,
the optimal manufacturing run time that minimizes the long-run average production–inventory cost is
derived. A numerical example is provided to show how the solution procedure works as well as the
usages of research results.
Keywords
Manufacturing , Replenishment run time , Machine Failure , Defective , Production and inventory control
Journal title
Computers & Industrial Engineering
Serial Year
2011
Journal title
Computers & Industrial Engineering
Record number
926081
Link To Document