Title of article
Two-machine flowshop scheduling with bicriteria problem
Author/Authors
Fuh-Der Chou، نويسنده , , Ching-En Lee، نويسنده ,
Issue Information
ماهنامه با شماره پیاپی سال 1999
Pages
16
From page
549
To page
564
Abstract
This paper attempts to solve a two-machine flowshop bicriteria scheduling problem with release dates for the jobs, in which the objective function is to minimize a weighed sum of total flow time and makespan. To tackle this scheduling problem, an integer programming model with N2+3N variables and 5N constraints where N is the number of jobs, is formulated. Because of the lengthy computing time and high computing complexity of the integer programming model, a heuristic scheduling algorithm is presented. Experimental results show that the proposed heuristic algorithm can solve this problem rapidly and accurately. The average solution quality of the heuristic algorithm is above 99% and is much better than that of the SPT rule as a benchmark. A 15-job case requires only 0.018 s, on average, to obtain an ultimate or even optimal solution. The heuristic scheduling algorithm is a more practical approach to real world applications than the integer programming model.
Keywords
Flow time , Makespan , Two-machine flowshop , Bicriteria scheduling
Journal title
Computers & Industrial Engineering
Serial Year
1999
Journal title
Computers & Industrial Engineering
Record number
926140
Link To Document