• Title of article

    Rubber tired gantry crane deployment for container yard operation

  • Author/Authors

    Richard Linn Thomas، نويسنده , , Jiyin Liu، نويسنده , , Yat-wah Wan، نويسنده , , Chuqian Zhang، نويسنده , , Katta G. Murty، نويسنده ,

  • Issue Information
    ماهنامه با شماره پیاپی سال 2003
  • Pages
    14
  • From page
    429
  • To page
    442
  • Abstract
    Container terminalʹs competitiveness is generally measured by the vessel discharging and loading time. The shore crane operation has attracted a number of research works. However, yard operation management has been very much experience based and did not receive much attention until last decade. This paper presents an algorithm and a mathematical model for the optimal yard crane deployment. The potential of the model in optimizing yard crane deployment was tested with a set of real operation data extracted from a major container yard terminal.
  • Keywords
    Crane deployment , Network model , container terminal
  • Journal title
    Computers & Industrial Engineering
  • Serial Year
    2003
  • Journal title
    Computers & Industrial Engineering
  • Record number

    926400