Title of article :
Estimating design effort for GE hydro projects
Author/Authors :
Hamdi A. Bashir ، نويسنده , , Vince Thomson، نويسنده ,
Issue Information :
ماهنامه با شماره پیاپی سال 2004
Pages :
10
From page :
195
To page :
204
Abstract :
Effort estimation is an essential process in determining the final cost, as well as the duration of, a future design project. This paper discusses the construction of a parametric model done in collaboration with General Electric (GE) Hydro (GE Hydro is a world leader in the design and construction of generators and turbines for hydro-electric power generation), the purpose being to estimate the effort needed to create designs for hydro-electric generators. An analysis of the data showed that the developed model resulted in a mean relative error of 13% compared to original estimation errors by GE Hydro staff, which averaged 27%. GE has been using the estimation model for its projects since the beginning of the year 2000.
Keywords :
Design effort , Parametric models , estimation
Journal title :
Computers & Industrial Engineering
Serial Year :
2004
Journal title :
Computers & Industrial Engineering
Record number :
926427
Link To Document :
بازگشت