Erratum to “Integrated production-inventory models for imperfect production process under inspection schedules” [Computers and Industrial Engineering 44 (2003) 633–650]
Author/Authors :
Chen-Sin Lin، نويسنده , , Chih-Hua Chen، نويسنده , , Dennis E. Kroll، نويسنده ,