• Title of article

    Production and delivery scheduling problem with time windows

  • Author/Authors

    J.M. Garcia، نويسنده , , S. Lozano، نويسنده ,

  • Issue Information
    ماهنامه با شماره پیاپی سال 2005
  • Pages
    10
  • From page
    733
  • To page
    742
  • Abstract
    This paper deals with the problem of selecting and scheduling the orders to be processed by a manufacturing plant for immediate delivery to the customer site. Among the constraints to be considered are the limited production capacity, the available number of vehicles and the time windows within which orders must be served. We first describe the problem as it occurs in practice in some industrial environments, and then present an integer programming model that maximizes the profit due to the customer orders to be processed. A tabu search-based solution procedure to solve this problem is developed and tested empirically with randomly generated problems. Comparisons with an exact procedure show that the method finds very good-quality solutions with small computation requirements.
  • Keywords
    Scheduling , No wait , Time Windows , Tabu search , Finite capacity
  • Journal title
    Computers & Industrial Engineering
  • Serial Year
    2005
  • Journal title
    Computers & Industrial Engineering
  • Record number

    926558