• Title of article

    Determining the optimal sequences and the distributional properties of their completion times in stochastic flow shops

  • Author/Authors

    Bajis Dodin، نويسنده ,

  • Issue Information
    ماهنامه با شماره پیاپی سال 1996
  • Pages
    15
  • From page
    829
  • To page
    843
  • Abstract
    This paper deals with a stochastic flow shop problem consisting of M machines and N jobs. The processing time of job j on machine i is an independent random variable with a given probability distribution function. It is assumed that preemption is not allowed and the existence of unlimited intermediate storage between the machines. The objective here, as it is in most flow shop investigations, is to determine a permutation (sequence) of the N jobs with the minimum makespan, which is the completion time of the last job on the last machine. Calculating the minimum makespan in the stochastic flow shop, if compared with the deterministic case, is harder, on the one hand; and on the other, the problem involves issues not existent in the deterministic case. It is shown in this paper that the minimum makespan (MM) in the stochastic case is a random variable (r.v.) not always connected to a particular sequence. Different realizations of the r.v. may correspond to different sequences. Consequently, a new concept for the optimal sequence is introduced. The distributional properties of the MM and their relations to those of the makespan of any sequence are analyzed. A lower bound on the expected value of the makespan of any sequence is derived. A practical heuristic procedure for determining or approximating the optimal sequence is developed. It is practtical in the sense that it is less restrictive than what has been developed so far and easier to implement. Computational experience is also provided.
  • Journal title
    Computers and Operations Research
  • Serial Year
    1996
  • Journal title
    Computers and Operations Research
  • Record number

    926769