Title of article :
Group scheduling on two cells with intercell movement
Author/Authors :
Wen-Hwa Yang، نويسنده , , Ching-Jong Liao، نويسنده ,
Issue Information :
ماهنامه با شماره پیاپی سال 1996
Pages :
10
From page :
997
To page :
1006
Abstract :
A set of jobs needs to be processed in a GT/CM system, which consists of two cells between which the intercell movement exists. One or more families are assigned to each of the cells. The problem under investigation is to determine a sequence of operations in each cell so as to minimize the mean flow time of jobs. Several properties of the problem are derived in this paper. These properties, together with a lower bound calculation, are used to develop a branch-and-bound solution procedure. A heuristic is also developed to solve large-sized problems. Computational results of both procedures are reported.
Journal title :
Computers and Operations Research
Serial Year :
1996
Journal title :
Computers and Operations Research
Record number :
926782
Link To Document :
بازگشت