• Title of article

    Single machine scheduling to minimize weighted earliness subject to maximum tardiness

  • Author/Authors

    Chen Tsiushuang، نويسنده , , Qi Xiangtong، نويسنده , , Tu Fengsheng، نويسنده ,

  • Issue Information
    ماهنامه با شماره پیاپی سال 1997
  • Pages
    6
  • From page
    147
  • To page
    152
  • Abstract
    In this paper, we study the problem of scheduling n jobs on a single machine to minimize the weighted earliness subject to a maximum tardiness for each job. This generalizes earlier work which is subject to deadline constraints. We derive several precedence relationship between jobs. These relationships are incorporated in a branch and bound solution procedure to curtail the enumeration. Because of the computational complexity of the problem, a heuristic algorithm in O(n2) time is developed. Both algorithms are tested via a computational study.
  • Journal title
    Computers and Operations Research
  • Serial Year
    1997
  • Journal title
    Computers and Operations Research
  • Record number

    926811