Title of article
Single machine scheduling to minimize weighted earliness subject to maximum tardiness
Author/Authors
Chen Tsiushuang، نويسنده , , Qi Xiangtong، نويسنده , , Tu Fengsheng، نويسنده ,
Issue Information
ماهنامه با شماره پیاپی سال 1997
Pages
6
From page
147
To page
152
Abstract
In this paper, we study the problem of scheduling n jobs on a single machine to minimize the weighted earliness subject to a maximum tardiness for each job. This generalizes earlier work which is subject to deadline constraints. We derive several precedence relationship between jobs. These relationships are incorporated in a branch and bound solution procedure to curtail the enumeration. Because of the computational complexity of the problem, a heuristic algorithm in O(n2) time is developed. Both algorithms are tested via a computational study.
Journal title
Computers and Operations Research
Serial Year
1997
Journal title
Computers and Operations Research
Record number
926811
Link To Document