• Title of article

    A new branch-and-bound approach for the n/2/flowshop/αF+βCmax flowshop scheduling problem

  • Author/Authors

    Wei-Chang Yeh، نويسنده ,

  • Issue Information
    دوهفته نامه با شماره پیاپی سال 1999
  • Pages
    18
  • From page
    1293
  • To page
    1310
  • Abstract
    In this study, a special situation involving a computationally difficult flowshop scheduling problem is discussed. The objective of this problem is to minimize a weighted combination of job flowtime and schedule makespan. An efficient Branch-and-Bound approach is developed here to solve this problem. The primary reason for developing this Branch-and-Bound approach is that its results can usefully guide other heuristic techniques, such as simulated annealing, tabu search, and genetic algorithms, in finding optimal or good quality solutions to larger sized problems. As evidence of the utility of the proposed approach, we present extensive computational results on random test problems. Our results compare favorably with previously developed algorithms in the literature.
  • Keywords
    branch-and-bound , Flowshop scheduling , Computational analysis
  • Journal title
    Computers and Operations Research
  • Serial Year
    1999
  • Journal title
    Computers and Operations Research
  • Record number

    927051