Title of article :
Economic lot sizing with the consideration of random machine unavailability time
Author/Authors :
N. E. Abboud، نويسنده , , M. Y. Jaber، نويسنده , , N. A. Noueihed، نويسنده ,
Issue Information :
دوهفته نامه با شماره پیاپی سال 2000
Pages :
17
From page :
335
To page :
351
Abstract :
This paper extends the work of Abboud and Salameh (Production and Inventory Management 28 (1987) 38–45) by assuming random machine unavailability time and where shortages are allowed. In multiple-item intermittent production runs, the machine might not be available to restart the production of the next batch for a specific item. This situation would result in shortages where items are either backordered or lost. The optimum operating inventory doctrine is obtained by trading off procurement cost per unit time, the inventory carrying cost per unit time, as well as the shortage cost per unit per unit time, so that their sum will be a minimum. Examples illustrating the calculation procedure are provided.
Keywords :
Backorders , Machine unavailability , Lot sizing , Lost sales
Journal title :
Computers and Operations Research
Serial Year :
2000
Journal title :
Computers and Operations Research
Record number :
927080
Link To Document :
بازگشت