Title of article :
Analysis of heuristics for the UET two-machine flow shop problem with time delays
Author/Authors :
V.J. Rayward-Smith، نويسنده , , D. Rebaine، نويسنده ,
Issue Information :
ماهنامه با شماره پیاپی سال 2008
Abstract :
The problem of minimising the overall completion time for the two-machine flow shop problem with unit execution time (UET) tasks and arbitrary time delays is known to be unary -hard. Two heuristic algorithms to solve this problem along with their worst-case analyses are presented. We also discuss computational experiments we conducted to study the average-case performance of these two heuristics using simulation and statistical sampling methods.
Keywords :
Time delays , Worst- and average-case analysis , Flow shop , Schedule length