Title of article :
Robust planninginoptimizationforproductionsystemsubjecttorandommachine breakdown andfailureinrework
Author/Authors :
Singa WangChiu، نويسنده ,
Issue Information :
ماهنامه با شماره پیاپی سال 2010
Pages :
10
From page :
899
To page :
908
Abstract :
This studyisconcernedwithrobustplanninginoptimization,specificallyindeterminingtheoptimal run timeforproductionsystemthatissubjecttorandombreakdownsunderabort/resume(AR)control policy andfailureinrework.Inmostreal-lifeproductionprocesses,generationofdefectiveitemsand breakdowns ofmanufacturingequipmentareinevitable.Inthisstudy,randomdefectiverateisassumed and allmanufactureditemsarescreened.Theperfectquality,reworkableandscrapitemsareidentified and separated;failure-in-reworkisassumed.Thesystemisalsosubjecttorandommachinebreakdown; and whenitoccurs,theARpolicyisadopted.Undersuchpolicy,theproductionoftheinterruptedlot will beimmediatelyresumedwhenthemachineisrestored.Mathematicalmodelingandderivationof the production-inventorycostfunctionsforbothsystemswith/withoutbreakdownsarepresented.The renewal rewardtheoremisusedtocopewiththevariablecyclelengthwhenintegratingcostfunctions. The long-runaveragecostperunittimeisobtained.Theoremsonconvexityandonboundsofproduction run timeareproposedandproved.Arecursivesearchingalgorithmisdevelopedforlocatingtheoptimal run timethatminimizestheexpectedproduction-inventorycosts.Anumericalexamplewithsensitivity analysis isprovidedtogiveinsightintotheoptimaloperationalcontrolofsuchanunreliablesystem.
Keywords :
Production , breakdowns , Robust planning , Failure in rework , Abort/resume policy
Journal title :
Computers and Operations Research
Serial Year :
2010
Journal title :
Computers and Operations Research
Record number :
927699
Link To Document :
بازگشت