Title of article
Single and two-resource allocation algorithms for minimizing the maximal lateness in a single machine
Author/Authors
Dvir Shabtay، نويسنده ,
Issue Information
دوهفته نامه با شماره پیاپی سال 2004
Pages
13
From page
1303
To page
1315
Abstract
In this paper we extend the classical single-machine scheduling problem with the maximal lateness criterion to the case where the job processing times are controllable by allocating common limited resources. For the single resource problem we determine the optimal job sequence and resource allocation in O(n3) time, while for the two-resource problem the optimal solution is obtained in O(n3 log(1/ )) time, where is a given accuracy. For both cases, we assume a convex resource consumption function.
Keywords
Scheduling , Project scheduling , Project Management , Heuristics , Local search algorithms
Journal title
Computers and Operations Research
Serial Year
2004
Journal title
Computers and Operations Research
Record number
928082
Link To Document