Title of article :
A note on minimizing maximum lateness in a two-machine no-wait flowshop
Author/Authors :
Parthasarati Dileepan، نويسنده ,
Issue Information :
دوهفته نامه با شماره پیاپی سال 2004
Pages :
5
From page :
2111
To page :
2115
Abstract :
Job scheduling for a two-machine flowshop where wait time between the first and the second machine is not permitted is studied in this paper. Aldowaisan and Allahverdi (J. Oper. Res. Soc. 53(9) (2002) 1004) considered this problem with minimizing total flowtime as the scheduling criterion and presented some necessary conditions for optimality. In this note their results have been modified for the scheduling criterion of minimizing maximum lateness.
Keywords :
Two-machine , No-wait , Lateness , Flowshop
Journal title :
Computers and Operations Research
Serial Year :
2004
Journal title :
Computers and Operations Research
Record number :
928129
Link To Document :
بازگشت