Title of article :
A Lagrangean-based heuristic for multi-plant, multi-item, multi-period capacitated lot-sizing problems with inter-plant transfers
Author/Authors :
Murali Sambasivan، نويسنده , , Salleh Yahya، نويسنده ,
Issue Information :
ماهنامه با شماره پیاپی سال 2005
Pages :
19
From page :
537
To page :
555
Abstract :
This paper addresses scheduling of lot sizes in a multi-plant, multi-item, multi-period, capacitated environment with inter-plant transfers. A real-world problem in a company manufacturing steel rolled products provided motivation to this research. A Lagrangean-based approach, embedded with a lot shifting–splitting–merging routine, has been used for solving the multi-plant, capacitated lot-sizing problem. A “good” solution procedure developed by Sambasivan (Ph.D. Dissertation, University of Alabama, Tuscaloosa, 1994) has been used for solving the relaxed problem. About 120 randomly generated instances of the problem have been solved and it has been found that Lagrangean-based approach works quite “efficiently” for this problem.
Keywords :
Multi-plant production planning , Lagrangean-based heuristic , Capacitated lot sizing
Journal title :
Computers and Operations Research
Serial Year :
2005
Journal title :
Computers and Operations Research
Record number :
928182
Link To Document :
بازگشت