Title of article :
Total completion time minimization in a computer system with a server and two parallel processors
Author/Authors :
S. Guirchoun، نويسنده , , P. Martineau، نويسنده , , J. -C. Billaut، نويسنده ,
Issue Information :
ماهنامه با شماره پیاپی سال 2005
Pages :
13
From page :
599
To page :
611
Abstract :
The context of the problem tackled in this paper is a computer system composed by a single server and two identical parallel machines. The processing times on the server are assumed to be unary and the objective is to minimize the total completion time. The papers dealing with scheduling problems with a server generally consider that the setup activities require simultaneously the server and the machine. In this paper, this constraint is not considered and the studied problem is a two-stage hybrid flow shop with no-wait constraint between the two stages. An algorithm that can solve optimally this problem in O(n log(n)) time is proposed. Finally, it is shown that solving this problem optimally leads to an optimal solution to the problem without the no-wait constraint.
Keywords :
Scheduling , Parallel machines , Single server , Hybrid flow shop
Journal title :
Computers and Operations Research
Serial Year :
2005
Journal title :
Computers and Operations Research
Record number :
928186
Link To Document :
بازگشت