Title of article
Scheduling a batch-processing machine subject to precedence constraints, release dates and identical processing times
Author/Authors
T. C. E. Cheng، نويسنده , , J. J. Yuan، نويسنده , , A. F. Yang، نويسنده ,
Issue Information
ماهنامه با شماره پیاپی سال 2005
Pages
11
From page
849
To page
859
Abstract
We consider the single machine parallel-batching scheduling problem with precedence relations, release dates and identical processing times to minimize a regular objective function. When the processing times are unit, we give an O(n2) time optimal algorithm. When there are no precedence relations, we solve this problem by dynamic programming in O(n3) time. When the precedence relations are “layerly complete”, we solve this problem by a dynamic programming algorithm that runs in O(n7) time. For the total weighted completion time minimization problem, we give an O(n2) time -approximation algorithm. For the makespan minimization problem, we give an O(n2) time optimal algorithm and an expression of the minimum makespan.
Keywords
Scheduling , Release dates , Batch processing , Identical processing times , Algorithms , Precedence constraints
Journal title
Computers and Operations Research
Serial Year
2005
Journal title
Computers and Operations Research
Record number
928200
Link To Document