Title of article :
A PSO and a Tabu search heuristics for the assembly scheduling problem of the two-stage distributed database application
Author/Authors :
Ali Allahverdi، نويسنده , , Fawaz S. Al-Anzi، نويسنده ,
Issue Information :
ماهنامه با شماره پیاپی سال 2006
Pages :
25
From page :
1056
To page :
1080
Abstract :
The assembly flowshop scheduling problem has been addressed recently in the literature. There are many problems that can be modeled as assembly flowshop scheduling problems including queries scheduling on distributed database systems and computer manufacturing. The problem has been addressed with respect to either makespan or total completion time criterion in the literature. In this paper, we address the problem with respect to a due date-based performance measure, i.e., maximum lateness. We formulate the problem and obtain a dominance relation. Moreover, we propose three heuristics for the problem: particle swarm optimization (PSO), Tabu search, and EDD. PSO has been used in the areas of function optimization, artificial neural network training, and fuzzy system control in the literature. In this paper, we show how it can be used for scheduling problems. We have conducted extensive computational experiments to compare the three heuristics along with a random solution. The computational analysis indicates that Tabu outperforms the others for the case when the due dates range is relatively wide. It also indicates that the PSO significantly outperforms the others for difficult problems, i.e., tight due dates. Moreover, for difficult problems, the developed dominance relation helps reduce error by 65%.
Keywords :
Assembly flowshop , Distributed database system , Heuristic , Scheduling , Maximum lateness , Tabu search , Particle swarm optimization
Journal title :
Computers and Operations Research
Serial Year :
2006
Journal title :
Computers and Operations Research
Record number :
928392
Link To Document :
بازگشت