Title of article :
Transmission assets investment timing using net present value curves
Author/Authors :
Reinaldo C. Garcia، نويسنده , , Javier Contreras، نويسنده , , Pedro F. Correia، نويسنده , , José I. Mu?oz، نويسنده ,
Issue Information :
ماهنامه با شماره پیاپی سال 2010
Pages :
8
From page :
598
To page :
605
Abstract :
Improvement and expansion of the transmission grid is still an unresolved issue in the new competitive environment. In current electricity markets, transmission lines have become assets that need financial instruments for investors who wish to ensure steady long-term returns and to withstand short-term market volatility. The timing and the combination of new transmission investments is key to analyze their long-term effects. This paper presents the concept of net present value (NPV) curve to estimate the best investment time for the investor, where the curve is constructed by calculating the NPVs resulting from the investment in successive years. A specific contract model based on financial transmission rights (FTR) is used for the NPV evaluation of transmission assets, and the stochastic properties of all variables related to the investment market structure are considered. The model is applied to the IEEE 24-bus Reliability Test System (RTS) showing the approach capabilities as a decision-aid tool for transmission investors.
Keywords :
Transmission investment , Financial transmission rights , Net present value curve
Journal title :
Energy Policy
Serial Year :
2010
Journal title :
Energy Policy
Record number :
969504
Link To Document :
بازگشت