Title of article
Market protocols in ERCOT and their effect on wind generation
Author/Authors
Ramteen Sioshansi، نويسنده , , David Hurlbut، نويسنده ,
Issue Information
ماهنامه با شماره پیاپی سال 2010
Pages
6
From page
3192
To page
3197
Abstract
Integrating wind generation into power systems and wholesale electricity markets presents unique challenges due to the characteristics of wind power, including its limited dispatchability, variability in generation, difficulty in forecasting resource availability, and the geographic location of wind resources. Texas has had to deal with many of these issues beginning in 2002 when it restructured its electricity industry and introduced aggressive renewable portfolio standards that helped spur major investments in wind generation. In this paper we discuss the issues that have arisen in designing market protocols that take account of these special characteristics of wind generation and survey the regulatory and market rules that have been developed in Texas. We discuss the perverse incentives some of the rules gave wind generators to overschedule generation in order to receive balancing energy payments, and steps that have been taken to mitigate those incentive effects. Finally, we discuss more recent steps taken by the market operator and regulators to ensure transmission capacity is available for new wind generators that are expected to come online in the future.
Keywords
Wind integration , reliability , Transmission operation
Journal title
Energy Policy
Serial Year
2010
Journal title
Energy Policy
Record number
969793
Link To Document