• Title of article

    Hydropower development priority using MCDM method

  • Author/Authors

    Thanaporn Supriyasilp، نويسنده , , Kobkiat Pongput، نويسنده , , Thana Boonyasirikul، نويسنده ,

  • Issue Information
    ماهنامه با شماره پیاپی سال 2009
  • Pages
    10
  • From page
    1866
  • To page
    1875
  • Abstract
    Hydropower is recognized as a renewable and clean energy sources and its potential should be realized in an environmentally sustainable and socially equitable manner. Traditionally, the decision criteria when analyzing hydropower projects, have been mostly a technical and economical analysis which focused on the production of electricity. However, environmental awareness and sensitivity to locally affected people should also be considered. Multi-criteria decision analysis has been applied to study the potential to develop hydropower projects with electric power greater than 100 kW in the Ping River Basin, Thailand, and to determine the advantages and disadvantages of the projects in five main criteria: electricity generation, engineering and economics, socio-economics, environment, and stakeholder involvement. There are 64 potential sites in the study area. Criteria weights have been discussed and assigned by expert groups for each main criteria and subcriteria. As a consequence of weight assignment, the environmental aspect is the most important aspect in the view of the experts. Two scenarios using expert weight and fair weight have been studied to determine the priority for development of each project. This study has been done to assist policy making for hydropower development in the Ping River Basin.
  • Keywords
    Multi-criteria , Renewable energy , Hydropower
  • Journal title
    Energy Policy
  • Serial Year
    2009
  • Journal title
    Energy Policy
  • Record number

    972624