Title of article :
Offshore wind development in China and its future with the existing renewable policy
Author/Authors :
R. James Yu، نويسنده , , Zhi-Jie Zheng، نويسنده ,
Issue Information :
ماهنامه با شماره پیاپی سال 2011
Pages :
5
From page :
7917
To page :
7921
Abstract :
Based on independent studies, this paper focuses on the significant discrepancy of 15 GW between the installed onshore wind generation capacity and what has been actually connected to the power network to reveal the challenges in meeting the Chinese renewable energy target. The recent accidents in Chinese North-Western transmission network (in February–April, 2011) demonstrated the urgent need for a fundamental review of the Chinese renewable energy policy. Offshore wind has been identified as the most feasible alternative to onshore wind to help deliver electricity to Eastern China during the summer peak time. By investigating and summarizing first hand experiences of participation in the Chinese renewable market, the authors provide the economic figures of the first cohort of Chinese offshore wind schemes. Large state owned enterprises (SOE) are dominating the offshore wind development, repeating their previous practices on the land. While this paper acknowledges the critical role of offshore wind generation in meeting Chinese renewable energy targets, it envisages an installed offshore capacity of approximately 2000 MW by 2015, much less than the 10000 MW governmental estimation, which can be attributed to the lack of detailed energy policy, network constraints, offshore wind installation difficulties and quality issues in the manufacture of turbines.
Keywords :
Chinese renewable energy policy , Offshore wind , Intertidal wind
Journal title :
Energy Policy
Serial Year :
2011
Journal title :
Energy Policy
Record number :
973520
Link To Document :
بازگشت