Title of article :
Implementation of wind power in the Norwegian market; the reason why some of the best wind resources in Europe were not utilised by 2010
Author/Authors :
Bernt Blindheim، نويسنده ,
Issue Information :
ماهنامه با شماره پیاپی سال 2013
Pages :
10
From page :
337
To page :
346
Abstract :
Norway has some of the best wind resources in Europe. In 1999, the Norwegian Parliament committed to attain an annual onshore wind power production goal of 3.0 TWh by 2010; however, in 2010, onshore wind power production measured only 1.0 TWh. This article discusses the reasons that this goal was not achieved. The analysis addresses the key figures on the strategic, tactical and operational levels. This model is combined with a time line that seeks to define when different actors should have secured concessions1 and funding to achieve the goal. After introducing the time line, a list of questions is introduced for these key actors. The three-level model, the time line and the questions constitute the analytical framework. Explanations for the failure to achieve the goal may be identified on all three levels. However, the primary explanatory factors were political uncertainty in the support scheme and wind powerʹs role in the energy market in general; both of these factors are identified on the strategic level. Uncertainty on the strategic level influenced the lower levels, which led to bottlenecks in the concession process and jittery investors who thought that the risk of investment in wind power was too high.
Keywords :
Wind power , Concession , Support scheme
Journal title :
Energy Policy
Serial Year :
2013
Journal title :
Energy Policy
Record number :
974291
Link To Document :
بازگشت