Construction of KEKB vacuum system: installation of vacuum chambers
Author/Authors
K. Kanazawa*، نويسنده , , S. Kato، نويسنده , , Y. Suetsugu*، نويسنده , , H. Hisamatsu، نويسنده , , M. Shimamoto، نويسنده , , M. Sato، نويسنده , , M. Shirai، نويسنده ,
Issue Information
روزنامه با شماره پیاپی سال 2001
Pages
4
From page
720
To page
723
Abstract
The operation of the KEKB accelerator at KEK started on December 1998 after about 4 yearsʹ construction. More than
2000 vacuum chambers and their attachments were installed progressing through some stages in last 2 years. Each stage was
set with speci®ed procedure and under careful quality control. The average base pressure in the order of 10ÿ8 Pa just before
the commissioning, and the following decrease of photon stimulated gas desorption proved the validity of our procedures.
# 2001 Elsevier Science B.V. All rights reserved
Keywords
Copper chamber , quality control , Accelerator , Ultra-high vacuum , Vacuum system