Title of article :
Construction of KEKB vacuum system: installation of vacuum chambers
Author/Authors :
K. Kanazawa*، نويسنده , , S. Kato، نويسنده , , Y. Suetsugu*، نويسنده , , H. Hisamatsu، نويسنده , , M. Shimamoto، نويسنده , , M. Sato، نويسنده , , M. Shirai، نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 2001
Pages :
4
From page :
720
To page :
723
Abstract :
The operation of the KEKB accelerator at KEK started on December 1998 after about 4 yearsʹ construction. More than 2000 vacuum chambers and their attachments were installed progressing through some stages in last 2 years. Each stage was set with speci®ed procedure and under careful quality control. The average base pressure in the order of 10ÿ8 Pa just before the commissioning, and the following decrease of photon stimulated gas desorption proved the validity of our procedures. # 2001 Elsevier Science B.V. All rights reserved
Keywords :
Copper chamber , quality control , Accelerator , Ultra-high vacuum , Vacuum system
Journal title :
Applied Surface Science
Serial Year :
2001
Journal title :
Applied Surface Science
Record number :
996819
Link To Document :
بازگشت