شماره ركورد :
20701
عنوان به زبان ديگر :
Time-Cost Trade-off Problem in Construction Project Management, Based on Fuzzy Logic
پديد آورندگان :
Abbasnia R نويسنده , Afshar A نويسنده , Eshtehardian E نويسنده
از صفحه :
4159
تا صفحه :
4165
تعداد صفحه :
7
چكيده لاتين :
In this study, a new approach has been investigated in solving time-cost trade off problem, because of uncertainties which affect on activity cost. Fuzzy logic theory is employed to consider affecting uncertainties in total direct and indirect cost of a construction project. Non-dominated Sorting Genetic Algorithm (NSGA), a multi objective optimization algorithm, is applied to provide a trade-off between time and total cost. Project manager can also have different non-dominated solutions or pareto solutions which are dependent on his measure of accepted risk through applying a cuts methods in fuzzy logic theory. The proposed model leads the decision maker to select the desirable pareto front solution through acceptable value of alpha cut.
شماره مدرك :
1204738
لينک به اين مدرک :
بازگشت