شماره ركورد كنفرانس :
4191
عنوان مقاله :
Designing an Advanced Available-to-Promise Mechanism Compatible with the Make-to-Forecast Production Systems
پديدآورندگان :
Rabbani Masoud School of Industrial Engineering, College of Engineering, University of Tehran, Tehran, Iran , Monshi Mina School of Industrial Engineering, College of Engineering, University of Tehran, Tehran, Iran , Rafiei Hamed Department of Industrial Engineering, Farabi College of Engineering, University of Tehran, Qum, Iran , sammak Jalali Moeen moeen.sammak@aut.ac.ir Amirkabir University of Technology- Tehran Polytechnic, Tehran, Iran
تعداد صفحه :
12
كليدواژه :
Advanced Available , to , Promise (AATP) , Make , to , Forecast (MTF) , batch , real , time mode ATP , jobshopscheduling , weighted earliness , tardiness cost , inventory allocation
سال انتشار :
1394
عنوان كنفرانس :
دوازدهمين كنفرانس بين المللي مهندسي صنايع
زبان مدرك :
انگليسي
چكيده فارسي :
In the competitive business world, applying a reliable and powerful mechanism to support decision makers inmanufacturing companies and help them to save time along with considering variety of effective factors is aninevitable issue. Advanced Available-to-Promise is a perfect tool to design and perform such a mechanism. In thisstudy, this mechanism which is compatible with the Make-to-Forecast production systems is presented. The ability todistinguish between batch mode and real-time mode advanced available-to-promise is one of the unique superioritiesof the proposed model. We also try to strengthen this mechanism by integrating the inventory allocation and job shopscheduling with considering due dates and weighted earliness/tardiness cost that leads to more precise decisions. AMIP model and a heuristic algorithm according to its disability to solve large size problems are presented. Thedesigned experiments and the obtained results have proved the efficiency of the proposed heuristic method.
كشور :
ايران
لينک به اين مدرک :
بازگشت