شماره ركورد كنفرانس :
3741
عنوان مقاله :
ارزيابي و انتخاب پيمانكاران با استفاده از TOPSIS فازي(مطالعه موردي:منطقه پنج عمليات انتقال گاز ايران)
عنوان به زبان ديگر :
Assessing Competence and Selection of Contractors Using Fuzzy TOPSIS (Case Study:The Fifth Reginal Iranian Gas Transmission Operations)
پديدآورندگان :
Abbasi Tavallali Pezhman pejmanat@gmail.com Najafabad Branch, Islamic Azad University , Hojati Seyed Moahamad Hosein mhh@iaushiraz.net Shiraz Branch, Islamic Azad University
تعداد صفحه :
15
كليدواژه :
ارزيابي , انتخاب , پيمانكاران , تاپسيس فازي
سال انتشار :
1396
عنوان كنفرانس :
سومين كنفرانس بين المللي مديريت و مهندسي صنايع با تاكيد بر مديريت دانش، تعالي و توانمندي رقابتي
زبان مدرك :
انگليسي
چكيده فارسي :
Extensive research and activities are done in the field of assessment and ranking of contractors. The volume of project activities of a country includes the basic indicators of development Since in the vast majority of projects’ budget will be spent on operating costs, Implementation of the project needs a contractor with the tailored ability to the project, to avoid the operating costs increasing and accomplish the project within the projected time and resources. Thus, numerous research has been carried out, each of which in turn are incomplete. In this paper fuzzy TOPSIS method was used to evaluate and determining the effective Criteria of assessing contractors, Friedman nonparametric test and a questionnaire is used, and to determine the weight of most effective Criteria, fuzzy AHP pairwise comparison matrix is introduced. In this paper a project of a gas transmission operations company of five regional in 2015 investigated using mentioned method and ultimately leads to top ranking of contractors and contractor selection in tender.
چكيده لاتين :
Extensive research and activities are done in the field of assessment and ranking of contractors. The volume of project activities of a country includes the basic indicators of development Since in the vast majority of projects’ budget will be spent on operating costs, Implementation of the project needs a contractor with the tailored ability to the project, to avoid the operating costs increasing and accomplish the project within the projected time and resources. Thus, numerous research has been carried out, each of which in turn are incomplete. In this paper fuzzy TOPSIS method was used to evaluate and determining the effective Criteria of assessing contractors, Friedman nonparametric test and a questionnaire is used, and to determine the weight of most effective Criteria, fuzzy AHP pairwise comparison matrix is introduced. In this paper a project of a gas transmission operations company of five regional in 2015 investigated using mentioned method and ultimately leads to top ranking of contractors and contractor selection in tender.
كشور :
ايران
لينک به اين مدرک :
بازگشت