Delays in construction projects management in the martyr and Veterans Affairs
پديدآورندگان :
Balak Ahmadreza نويسنده
تعداد صفحه :
5
كليدواژه :
Delays , Causes delays in project
عنوان كنفرانس :
مجموعه مقالات اولين همايش بين المللي مديريت
زبان مدرك :
فارسی
چكيده فارسي :
Increase the delay time to the time specified in the project contract. Most development projects are delayed in their implementation of Thereby increasing administrative costs and delays in operational time is. Investigate the reasons for the delay and provide solutions to help minimize delays to avoid wasting lots of money and will shorten the operation time. According to the Plan and Budget Organization, the largest share of the budget is allocated to development projects in Khuzestan province. So Delays projects and solutions contributed to the loss of financial resources. In this research project by the pool and Rehabilitation Clinic Foundation, Department of Veterans Affairs martyr and studied. Time delay of the project is 30 months and 22 months. Factors affecting the utilization of project delay, the cause was identified 24 . The elements in 4 groups, employer, consultant, contractor and weather conditions and other factors were analyzed. Each of the delay in the questionnaire by 50 experts in the scoring range of 1 to 5 , respectively. The results of the poll by 18 spss software for statistical analysis was performed. The results of this application indicated that among the four study groups, causes delays guild to obtain the largest employer And causes of delays related to weather conditions and other contributions have been minimal. Among the studied cases of employer groups, lack of funding has the greatest impact on delay.
شماره مدرك كنفرانس :
3989045
سال انتشار :
1393
از صفحه :
1
تا صفحه :
5
سال انتشار :
0
لينک به اين مدرک :
بازگشت