• Author/Authors

    ELMAS, Eda Kaleseramik Porselen İzolatör Fabrikası - Çanakkale Kalebodur Seramik San A Ş, Turkey , ÖREN, Mehmet Giray Kaleseramik Porselen İzolatör Fabrikası, - Çanakkale Kalebodur Seramik San A Ş, Turkey , TABAK, Yasemin TÜBİTAK MAM - Malzeme Enstitüsü, Turkey , KILIÇ, Ayşen TÜBİTAK MAM - Malzeme Enstitüsü, Turkey , TOPRAK, Murat Kaleseramik Porselen İzolatör Fabrikası - Çanakkale Kalebodur Seramik San A Ş, Turkey

  • Title Of Article

    Acceleration Setting Time of Porcelain Insulator Joining Mortar with Hot Water Curing

  • شماره ركورد
    27627
  • Abstract
    The setting time of porcelain insulator joining mortar takes 2 or 3 days in setting rooms during the long term production process. Setting process includes the following steps. The insulators are keeped to gain their strength after pinned for 1 day on holders. In the second day, the pinned insulators are mortared to be keplenmek and taken into setting rooms. The setting time is 2 days for K3 insulators and 1 day for chain type insulators. A short setting time is important for transporting termins to the customers and for reducing the number of workers. So that, in this study, it was aimed to reduce the setting time of mortar.
  • From Page
    193
  • NaturalLanguageKeyword
    “Porcelain Insulator , Setting Time , Curing , Strength
  • JournalTitle
    Afyon Kocatepe University Journal Of Science an‎d Engineering
  • To Page
    195
  • JournalTitle
    Afyon Kocatepe University Journal Of Science an‎d Engineering