DocumentCode :
1011519
Title :
The Columbia Basin Project
Author :
Darland, Alvin F.
Author_Institution :
Native of Tacoma, Wash.
Volume :
56
Issue :
11
fYear :
1937
Firstpage :
1339
Lastpage :
1345
Abstract :
Grand Coulee Dam, now under construction on the Columbia River in the State of Washington, will create a 150-mile lake from which irrigation water for more than a million acres of land will be pumped by part of the power to be generated at the dam. This article describes the purposes of the project, which will not be completed in its entirety for half a century, and the present status of construction of the dam.
Keywords :
Agricultural engineering; Cities and towns; Irrigation; Lakes; Power generation; Rivers; Water storage;
fLanguage :
English
Journal_Title :
American Institute of Electrical Engineers, Transactions of the
Publisher :
ieee
ISSN :
0096-3860
Type :
jour
DOI :
10.1109/T-AIEE.1937.5057468
Filename :
5057468
Link To Document :
بازگشت