• DocumentCode
    1011966
  • Title

    Switchboards for Boulder Power Plant

  • Author

    McClellan, L.N. ; Peterson, A.J.A. ; Garman, C.P.

  • Author_Institution
    Chief electrical engineer of the United States Bureau of Reclamation, Denver, Colo.
  • Volume
    56
  • Issue
    2
  • fYear
    1937
  • Firstpage
    224
  • Lastpage
    244
  • Abstract
    Switchboards for the power plant at Boulder Dam are unusual not alone for their size, but also for the combination in one plant of switchboard designs and methods that have been used individually but seldom together. The plan of the power plant and the switchboards and control equipment are described in this paper.
  • Keywords
    Automatic generation control; Centralized control; Circuit breakers; Control systems; Design methodology; Industrial plants; Power generation; Substations; Switching systems;
  • fLanguage
    English
  • Journal_Title
    American Institute of Electrical Engineers, Transactions of the
  • Publisher
    ieee
  • ISSN
    0096-3860
  • Type

    jour

  • DOI
    10.1109/T-AIEE.1937.5057516
  • Filename
    5057516