DocumentCode :
1015774
Title :
The Pumping System of the Colorado River Aqueduct
Author :
Gaylord, J.M.
Author_Institution :
Chief electrical engineer for The Metropolitan Water District of Southern California, Los Angels.
Volume :
58
Issue :
3
fYear :
1939
fDate :
3/1/1939 12:00:00 AM
Firstpage :
112
Lastpage :
123
Abstract :
This paper describes the power features of the aqueduct being built to supplement the water supply of Southern California. Three hundred thousand kilowatts of power ultimately will be transmitted from Boulder Dam to operate 45 synchronous motors driving centrifugal pumps. High efficiency, long life, and simplicity of design are given precedence over close voltage regulation and the elimination of momentary interruptions.
Keywords :
Capacitance; Circuits; Electrostatic analysis; Magnetic fields; Rivers; Telephony; Transmission line theory; Voltage fluctuations;
fLanguage :
English
Journal_Title :
American Institute of Electrical Engineers, Transactions of the
Publisher :
ieee
ISSN :
0096-3860
Type :
jour
DOI :
10.1109/T-AIEE.1939.5057934
Filename :
5057934
Link To Document :
بازگشت