• DocumentCode
    1015774
  • Title

    The Pumping System of the Colorado River Aqueduct

  • Author

    Gaylord, J.M.

  • Author_Institution
    Chief electrical engineer for The Metropolitan Water District of Southern California, Los Angels.
  • Volume
    58
  • Issue
    3
  • fYear
    1939
  • fDate
    3/1/1939 12:00:00 AM
  • Firstpage
    112
  • Lastpage
    123
  • Abstract
    This paper describes the power features of the aqueduct being built to supplement the water supply of Southern California. Three hundred thousand kilowatts of power ultimately will be transmitted from Boulder Dam to operate 45 synchronous motors driving centrifugal pumps. High efficiency, long life, and simplicity of design are given precedence over close voltage regulation and the elimination of momentary interruptions.
  • Keywords
    Capacitance; Circuits; Electrostatic analysis; Magnetic fields; Rivers; Telephony; Transmission line theory; Voltage fluctuations;
  • fLanguage
    English
  • Journal_Title
    American Institute of Electrical Engineers, Transactions of the
  • Publisher
    ieee
  • ISSN
    0096-3860
  • Type

    jour

  • DOI
    10.1109/T-AIEE.1939.5057934
  • Filename
    5057934