    This paper sets forth briefly two general procedures that may be followed in starting the system of the Philadelphia Electric Company after a complete shutdown, and also gives some experiences relating to re-establishing service. There is also included an outline of some of the major principles of design followed in the development of the system which are important in minimizing the chance of a complete system shutdown and in facilitating restoration of service in the event of a complete outage.
  • Keywords
    Boilers; Cities and towns; Hydroelectric power generation; Power generation; Power generation economics; Power system restoration; Spine; Substations;
  • fLanguage
    English
  • Journal_Title
    American Institute of Electrical Engineers, Transactions of the
  • Publisher
    ieee
  • ISSN
    0096-3860
  • Type

    jour

  • DOI
    10.1109/T-AIEE.1940.5058009
  • Filename
    5058009