DocumentCode :
1018359
Title :
Fuzzy critical path method
Author :
Nasution, Sofjan H.
Author_Institution :
Nusantana Aircraft Ind., Bandung, Indonesia
Volume :
24
Issue :
1
fYear :
1994
fDate :
1/1/1994 12:00:00 AM
Firstpage :
48
Lastpage :
57
Abstract :
There have been several attempts in the literature to apply fuzzy numbers to the critical path method. The result delivers the earliest expected time for each event of the project. This paper shows that further extension can be made by considering the interactive fuzzy subtraction and by observing that only the nonnegative part of the fuzzy numbers can have physical interpretation. Based on these two observations, the formulas for the latest allowable time and slack for each event are presented. The availability of fuzzy slacks provides enough information, at least for certain α-level of the slack, to identify the critical path in the network model of the project. Thus, practically we can generalize the critical path method by accepting imprecise, fuzzy data for the duration of the activities
Keywords :
critical path analysis; fuzzy set theory; fuzzy critical path method; fuzzy numbers; fuzzy slacks; imprecise fuzzy data; interactive fuzzy subtraction; latest allowable time; network model; project; Aerospace industry; Aircraft; Algebra; Computer networks; Electrical capacitance tomography; Fuzzy set theory; Fuzzy sets; Helium; Joining processes; Path planning;
fLanguage :
English
Journal_Title :
Systems, Man and Cybernetics, IEEE Transactions on
Publisher :
ieee
ISSN :
0018-9472
Type :
jour
DOI :
10.1109/21.259685
Filename :
259685