• DocumentCode
    1019855
  • Title

    Electrical, control and instrumentation aspects of the Drax flue gas desulphurisation plant

  • Author

    Knight, R.P. ; Marchant, C.J. ; Rogers, J.G.

  • Author_Institution
    Eng. & Project Services Div., Drax FGD Project, Swindon, UK
  • Volume
    7
  • Issue
    6
  • fYear
    1993
  • fDate
    12/1/1993 12:00:00 AM
  • Firstpage
    247
  • Lastpage
    256
  • Abstract
    There has been increasing awareness of the problems of acid rain and the need to reduce sulphur dioxide emissions from power stations. The retrofitting of flue gas desulphurisation equipment to Drax power station is a major part of the emission reduction programme in the UK, and at £700 million is National Power´s largest capital project. This article concentrates on three aspects of the project: electrical supplies, the FGD plant distributed control system and railway signalling
  • Keywords
    air pollution detection and control; distributed control; distribution networks; flue gas desulphurisation; power station computer control; railways; signalling; sulphur compounds; thermal power stations; Drax flue gas desulphurisation plant; National Power; SO2; SO2 emissions reduction; acid rain; distributed control system; electrical supplies; railway signalling; sulphur dioxide emissions reduction;
  • fLanguage
    English
  • Journal_Title
    Power Engineering Journal
  • Publisher
    iet
  • ISSN
    0950-3366
  • Type

    jour

  • Filename
    260117